Renovating a house in Colombia: permits, historic centers and the order of work

Renovations6 min readJuan David Enriquez

Leer en español

Draft under review.

Living room in a renovated house, with a green wall

Renovating a house in Colombia? Learn when you need a permit, what applies in historic centers, what adds to costs and how to plan the work.

When renovating a house in Colombia, the first thing to establish is whether the work needs a permit. Painting, replacing flooring or tile, or repairing internal utility systems without touching the structure generally does not require one. Removing or moving walls, extending the house, adding a floor, or changing the facade or the building’s use does. Next comes the structure, which needs careful attention in an earthquake-prone country, and the order of work, where you can save money or waste it.

Do I need a permit to renovate in Colombia?

Colombian regulations distinguish between two types of work. Reparaciones locativas (maintenance work that does not alter the structure, built area, facade or use) include painting, flooring, tile, ceilings, replacing internal utility systems and roof repairs that leave the structure intact. This work does not require a building permit, except in listed heritage properties (bienes de interés cultural), where even maintenance may need authorization.

Work that changes the structure, built area, facade or use does require a permit, processed through a curaduría (the private licensing office that issues building permits) or, in municipalities without one, the planning office. Depending on the work, the permit may cover a change of use, modifications, an extension or structural reinforcement. Metrocuadrado explains this with examples. If your home is in a residential complex, also check the propiedad horizontal bylaws (condominium rules): changes to facades or common areas usually need approval from the owners’ association.

Allow time for the application. Under the regulations, curadurías have up to 45 business days to decide on an application, as summarized in this colombiamove guide, updated in October 2026. In practice, requests for clarification and corrections add time. Include that allowance in the schedule from the start.

If you are unsure about your project, ask the curaduría or planning office before hiring a contractor. Renovating without a required permit can lead to a fine or an order to stop work halfway through.

If your house is in a historic center

Many Colombian cities have protected historic centers, where different rules apply. Several of them have a PEMP (Special Management and Protection Plan), which assigns each property a permitted level of intervention. That level determines what you can change inside and outside, and which materials you can use.

If your house is in a historic center or is a designated cultural heritage property, find out which rules apply to your property before starting the design, and confirm whether you need authorization from the heritage authority in addition to a building permit. Designing first can leave you with plans that will not be approved.

Colombia is earthquake-prone: start with the structure

Much of the country, especially the Andean region and the Pacific coast, has high or intermediate seismic hazard. If the renovation affects load-bearing walls, creates large openings or adds a floor, the structure needs to be checked against NSR-10 (Colombia’s earthquake-resistant construction regulations) and often needs reinforcement. That review is even more important in older bahareque (wattle and daub) or adobe houses.

Removing a wall “because it is in the way” without knowing whether it carries loads is one of the most expensive renovation mistakes you can make.

The order of work when renovating a house in Colombia

This is the order I follow:

  1. Site visit and assessment: check the structure, damp, and electrical and plumbing systems.
  2. A measured survey of the house as it stands.
  3. Sketch: draw the proposed changes before demolishing anything.
  4. Design and budget: drawings, quantities, schedule and cash flow.
  5. Permit, if the work requires one.
  6. Construction in stages: structure, utility systems and roof first, then finishes.
  7. Handover, with utility systems tested and all punch-list items completed.

Many people skip the sketch, but it is the step that prevents the most changes during construction. For a real renovation example, see Casa Velasco, from sketch to construction: the kitchen was drawn before any wall was touched, and the finished room closely matched the drawing.

Recreated design sketch of the Casa Velasco kitchen, with a stone column, wood slat frame and white island
Recreated sketch of the Casa Velasco kitchen
The completed Casa Velasco kitchen, with a stacked stone column, illuminated wood frame and white island
The same kitchen, built

The same sequence works for facade renovations, such as those at Bosques del Campestre (777 m² that I remodeled in 2025), or a commercial space such as Restaurante Antojao.

What makes a renovation more expensive

What demolition reveals

An existing house almost always holds surprises: old pipes, wiring that does not meet requirements, damp behind the tile. An initial assessment reduces those surprises without eliminating them, so a realistic budget includes a contingency allowance.

Changes during construction

Moving a plumbing connection after the floor is installed means tearing up the floor and laying it again. Deciding on its location in the drawings would have cost much less. Finalizing the sketch and design before work starts reduces changes on site.

Finishes

As with a new house, finishes are the part of the budget that varies most. For an idea of costs per square meter, see how much it costs to build a house in Colombia. A renovation needs its own budget, but the factors are similar.

Can you live in the house during the work?

It depends on the scope. If the renovation proceeds room by room, with the kitchen first and then the bathrooms, you can stay in the house with some inconvenience. If it involves the structure, roof or all the utility systems at once, moving out is the better option. Work moves faster, and the family avoids living among dust and debris.

Frequently asked questions

What counts as reparaciones locativas?

This is maintenance that does not alter the structure, built area, facade or use: painting, flooring, tile, ceilings, internal utility systems or roof repairs. It does not require a building permit.

Do I need a permit to renovate a kitchen or bathroom?

If you are only replacing cabinets, tile, fixtures and internal utility systems without touching load-bearing walls, the work generally counts as reparaciones locativas. If you move or remove walls, you may need a permit. Confirm with the curaduría or planning office.

How much does it cost to renovate a house in Colombia?

It depends on the house’s condition, how much work the structure and utility systems need, and the finishes. That is why the budget comes after the assessment and sketch, using measured quantities.

How long does a renovation take?

It depends on the size of the job. Add design and construction time to the permit process, if required: the permit office has up to 45 business days under the regulations, plus time for any corrections it requests.

Can I renovate a house in a historic center?

Yes, within what heritage regulations allow for your property. These may include the historic center's PEMP, where one exists. Check its intervention level first, since that determines what you can change inside and outside.

What happens if I renovate without a permit?

If the work required a permit, you risk fines and an order from the authorities to stop construction. A house with unpermitted alterations is also harder to sell or mortgage.

Have a house to renovate? See the services I offer, from design to construction supervision, request a quote, or tell me what you want to change, and we can start with a site visit.